Playscape Design

Site map of Stage 3 pathways and playground equipment in Waterlily park.

Waterlily Playscape Design Plan 12.12.18 site plan -1

site plan schedule

Byron Shire Council with the support of Waterlily Community Playscape, received state funding to implement Stage 3 plans:

  • Car park upgrade – completion due December 2018
  • Walk and cycle pathway – completion due December 2018
  • Shade Sail – completion due December 2018
  • Tree house – begin March, due by June 2019
  • Flying fox – begin March, due by June 2019

Final design plans for these items are not yet available.

See Byron Shire Council website for updates.

Waterlily Park Stage 3 Community Consultations

During March 2018, Waterlily Playscape committee prepared an online and paper survey relating to Waterlily Park, its facilities and future plans. 225 people completed the survey.
Waterlily Playscape Community Survey March 2018 PDFweb page

During May 2018, Byron Shire council staff prepared an online survey promoted through social media and through 1,600 flyers to residences in Ocean Shores. 49 surveys were completed.
Byron Shire Council May 2018 community consultation results PDF

12 Treehouse WCP design and council tender

WCP treehouse design proposal

WCP treehouse design proposal

The WCP treehouse design aims for maintaining wooden materials, all abilities access to the upper level and additional features for younger children in the lower ground level.

Play Element Proposed by Successful Tenderer

Play Element Proposed by Successful Tenderer

The tender design has a reduced size to be co-located with the fort (4), replacing the exercise equipment (3). The tender play element design does not allow for all ability access to upper level.

Proposed Site Plan

By Utopian Design
Architectural Design + Drafting
www.utopian-design.com

Full Site plan PDF
Full PDF Waterlily Playscape Design Plan 12.12.18 site plan

 

Please note: WCP treehouse (12) location has been updated from end of flying fox (14) to between basket swing (9) and flying fox.

site plan schedule

Preliminary Drawings

Revision 1 A • 15/11/16

By Utopian Design
Architectural Design + Drafting
www.utopian-design.com

thumbnail of rachelles-waterlily-playscape-plan-1-of-2

thumbnail of rachelles-waterlily-playscape-plan-2-of-2

Waterlily Playscape DRAFT Concept Plan

Updated REV D (PDF 10MB): G16_04_DRAFT_LANDSCAPE_CONCEPT_160714

Below: Issue C • DRAFT • 30/06/16

By Cassandra Denney
Associate • Gold Coast Manager
CLOUSTON Associates

thumbnail of G16_04_DRAFT_LANDSCAPE_CONCEPT_160630 REV C (p1)

thumbnail of G16_04_DRAFT_LANDSCAPE_CONCEPT_160630 REV C (p2)

thumbnail of G16_04_DRAFT_LANDSCAPE_CONCEPT_160630 REV C (p3)

thumbnail of G16_04_DRAFT_LANDSCAPE_CONCEPT_160630 REV C (p4)

thumbnail of G16_04_DRAFT_LANDSCAPE_CONCEPT_160630 REV C (p5)

thumbnail of G16_04_DRAFT_LANDSCAPE_CONCEPT_160630 REV C (p6)